Automated Quantity Takeoff and BOQ: Why Quantities Should Come from the Model
Automated quantity takeoff computes quantities (earthworks, pavement, concrete, reinforcement, finishes) directly from the design model instead of measuring them from drawings. Because the bill of quantities (BOQ) is derived from the same model as the drawings, every design change updates the BOQ, the cost estimate, the schedule and the cash flow at the same time, and the quantities always match the issued sheets.
The problem with measuring from drawings
Manual takeoff has three structural weaknesses:
- It lags behind the design. Every revision means re-measuring, so the BOQ is often one revision behind the drawings.
- It is hard to audit. A number in a spreadsheet rarely shows which drawing, section or element it came from.
- It multiplies errors. Similar items (identical villas on many plots, similar streets) are measured repeatedly, and a single mistake repeats with them.
How model-based takeoff works
- Every element carries its geometry and properties. A road knows its section and pavement layers; a villa knows its rooms, walls, openings and finishes; a frame knows its members.
- Quantities are computed per element. For example, pavement area per layer, kerb length, cut and fill volume, concrete volume, reinforcement weight, wall and floor finish areas.
- Items are grouped into a BOQ structure with units and descriptions, and merged across linked copies (for example 100 instances of villa type A).
- Unit rates turn quantities into cost, in the local currency with the local tax.
- Downstream documents update automatically: schedule durations, cash flow, payment certificates.
What can be quantified automatically
| Discipline | Typical automated quantities |
|---|---|
| Earthworks | Cut, fill, mass haul, before/after survey volumes |
| Roads | Pavement layers (m², m³), kerbs (m), sidewalks, earthworks per street |
| Architecture | Floor, wall, ceiling and paint areas; door and window schedules |
| Structure | Concrete volumes, formwork, reinforcement and bar bending schedule (BBS) |
| Utilities | Pipe lengths by diameter, manholes, trench excavation |
| Bridges | Precast girders, piers, abutments, deck quantities |
From BOQ to cost, schedule and payment
A BOQ is most valuable when it is connected to the rest of the project controls:
- Cost estimate: editable rate library per country, with currency and VAT.
- Tender documents: specifications organised by MasterFormat divisions, tender BOQ and tender index.
- CPM schedule: activities, durations, critical path and a local work calendar.
- Cash flow and S-curve: including advance payment, retention and defects liability period.
- Interim payment certificates (IPC): with retention and deductions, and quantities from monthly surveys.
- Earned value (EVM): schedule performance index (SPI) to track progress against plan.
Version comparison: what changed and what it costs
When the client asks for a change, the most useful question is "what does it cost?". With versioned projects (v1, v2, v3), the platform can produce a change report listing changed elements and the quantity difference for every BOQ item between two versions, so the cost impact is visible before the change is approved.
How Rawax handles quantities
In Rawax, the BOQ, cost estimate, schedule and cash flow are all derived from the project model:
- BOQ for every element in the project, merged across similar copies, with Excel export.
- Price library in the currency and tax of 17 countries, editable by the office to match its suppliers.
- Bar bending schedule with lengths and weights for structural elements.
- CPM schedule, S-curve, payment certificates and earned value.
- Site records: RFIs, submittals, NCRs and daily reports.
- Version comparison reports with quantity differences.
The free public quantity calculator and BOQ generator pages on rawax.io work in the browser without signing up.
Related reading: civil engineering automation and cut and fill calculation.
FAQ
What is automated quantity takeoff?
Automated quantity takeoff is the calculation of construction quantities directly from a digital design model, instead of manually measuring printed or CAD drawings.
Is model-based takeoff more accurate than manual takeoff?
It removes measurement and transcription errors and keeps quantities in sync with the latest design. Accuracy still depends on the model being complete and correctly classified, so a quantity surveyor should review the BOQ.
Can the BOQ update automatically when the design changes?
Yes. When quantities are derived from the model, changing an element (for example a lane width or the number of rooms) recalculates the affected BOQ items, cost and schedule.
Which units and currencies are supported?
Rawax works in metric units and supports the currency and VAT settings of 17 countries, with unit rates that each office can adjust.
Can I export the BOQ to Excel?
Yes. BOQ, quantity tables, payment certificates and schedules export to Excel (XLSX).